Hanging Unloading Platforms: Flexible Hubs For Overhead Material Transfer

Hanging Unloading Platforms: Flexible Hubs For Overhead Material Transfer

PRODUCT CATEGORY: Retractable Loading Platform

Max uniform load:3000kg

Outer width wl:2180mm-4180mm

Inner width w2:1650mm-3630mm

Height of installation space:2400mm-3800mm

Assembly Length:5500mm

Assembly height:400mm-500mm

Self weight:2t-3.2t


PRODUCT DESCRIPTION

In high-rise buildings, bridge projects and urban renewal projects, hanging unloading platforms have become the core equipment for overhead material transfer with their suspended installation design and spatial adaptability.


Its lightweight structure and intelligent safety system accurately solve the problems of narrow working surface at height and limited ground space, and build an efficient and safe material transfer platform for the construction site.


Suspended design, releasing space for overhead work

Adopting high-strength steel to build a suspended frame, which is firmly connected to the main structure of the building through embedded parts or attachment devices, and can carry loads in the air without ground support.



The lightweight construction avoids the occupation of space below the working surface, especially suitable for dense building complexes in city centers, bridge piers and columns working at height, etc. It provides flexible docking pivots for lifting equipment such as tower cranes and construction elevators, and realizes the seamless connection from vertical transportation of materials to the working surface.


Full Scene Adaptation, Customized Solutions

High-rise building construction: hanged on the facade of the standard floor, it supports the short floor barging of bulk materials such as steel bars, templates, decorative materials, etc. It is especially suitable for the efficient transfer of turnover materials in the construction of aluminum film, and it becomes the key connection node between the main structure and the decoration stage.

Bridge engineering maintenance: suspended from the side of the box girder or pier maintenance channel, close to the overhead work surface to realize the temporary storage of tools and small components, to solve the problem of long cycle and high risk of traditional scaffolding construction.


Parameters

Specifications Model
XDLP 22 XDLP 26 XDLP32 XDLP36 XDLP42
Max uniform load(Kg) 3000 3000 3000 3000 3000
Outer width W1(mm) 2180 2580 3180 3580 4180
Inner width W2(mm) 1650 2050 2650 3030 3630
Distance of floor anchorage W3(mm) 2110 2510 3110 3495 4095
Distance of prop W4(mm) 2030 2430 3030 3405 4005
Height of installation space(mm) 2400-3800 2400-3800 2400-3800 2400-3800 2400-3800
Assembly Length(mm) 5500 5500 5500 5500 5500
Assembly height(mm) 400 400 400 500 500
Self weight(t) 2.0 2.2 2.5 2.8 3.2
Surface treatment of Side panel galvanized sheet and Painting
Surface treatment of the frame Painting or galvanized
Applied
Force(KN)
Fixed with
prop
RA 84.0 87.0 89.0 95.0 102.0
RB 60.0 61.0 63.0 68.0 73.0
RC 6.5 6.5 7.2 7.6 8.0
Fixed with
floor anchorage
RA 104.0 107.0 109.0 115.0 122.0
RB0 75.0 76.0 78.0 83.0 88.0
RC0 4.0 4.0 4.7 5.1 5.5
Applicable container 20‘GP 40‘OT 40‘OT 40‘OT Bulk cargo Bulk cargo
Max Qty Of Package 4 10 8 8 / /
*Outboard(mm)/Load ratio:4500/100%, 4750/80%, 5000/60%, 5250/50%.